Real Process Improvement
Steve Neuendorf
Independent Management Consultant
Process improvement: The name belies its nature. Many people see it as the way to
build products better, faster, and cheaper. In truth, there are many ways to be better,
faster, and cheaper at whatever you are doing, and process improvement is only one of
them. However, process improvement is the most reliable because first it works on people
and only then does it work on the process. First you understand how good, fast, and cheap
a process is and why it is that way. You also develop an understanding of why alterations
of a process or adoption, as well as altogether different processes may be better, faster,
or cheaper. With this understanding, you can then implement the changes that will result
in improved performance.
veryone agrees on what process improvement is,
right? It is the most discussed topic in software engineering. It has been around for such
a long time; there is no need to define anything before launching into a familiar
discussion, right? Wrong.
Process Improvement Defined
To paraphrase W. Edward Deming, author of Out of the Crisis, process improvement is
not something you talk about; it is something you do. For process improvement in software
engineering, when all is said and done, a lot more is said than done. What is worse, far
too much of what is done is done wrongthe process is not better, and process
improvement is besmirched. Let us look at process improvement and see if there is a way to
effectively and consistently improve software engineering processes.
Two things need to be understood: process and improvement. It may
sound silly, but the number of different definitions and their imprecision lead to a great
deal of confusion and misunderstanding about process improvement.
A prerequisite for process improvement is to have a comprehensive
process definition. The operating definition of process is "the definition of the way
in which something is intended to be done." Any process has an accomplishment
objective. A process must describe the steps to achieve its objective and the means to do
the steps. Since this definition could apply to many things, for software engineering, our
process is assumed to have a formal definition so that it can be repeated.
Important Terms and Concepts
A variety of concepts must be understood before you can make the distinctions needed to
initiate true process improvement.
Processes vs. Projects
Distinguish processes from projects: A process is the intended way to complete a project,
whereas a project is the application of resources to that process. Because projects are
tangible, the only way you can measure a process is to measure projects and use the
information to make inferences about the process. When measuring, it is important to know
what can affect processes and projects:
- Processes are affected by common causes of variation, e.g., teams, tools,
environment. When you work on common causes, it is called "process improvement."
Common causes should be addressed by your process.
- Projects can be affected by either common or special causes of variation,
e.g., system failures, attrition, or improper schedule or budget. Working on special
causes is (or should be) problem identification and correction, commonly called "fire
fighting." Special causes cannot necessarily be prevented or addressed through
process changes.
You must always distinguish which type of cause is at work,
because if you treat a common cause with special cause techniques and tools (or vice
versa), you are "meddling" rather than solving problems. Meddling invariably
causes more "fires," and fire fighting does not improve processes.
Efficiency, Cycle Time, Quality
Three characteristics describe any process:
- Efficiency (E) - the relationship between resource use and accomplished results.
- Cycle Time (T) - the "design speed" of the process, i.e., the speed of
a particular development process relative to other processes (assuming certain factors are
equal).
- Quality (Q) - the quality of the process.
You may laugh when someone says "good, fast,
cheappick two" but this is more insight than humor. For any process,
function f(E,T,Q) = constant K
Therefore, if you want better and faster and cheaper, you will need a
different process.
Sequence and Means
Sequence and means are the two elements of a process. Sequence is simply the order in
which things are accomplished. There are two types of sequences:
- Required - an order that must be followed, as demonstrated through
precedence, i.e., putting on a second coat of paint requires that the first coat already
be applied and cured. In software development, precedence has long shown it is best to
start coding after the requirements are gathered.
- Discretionary - the order in which it is decided that something will be
done. Past precedence and the availability of related means influence the sequence in
which discretionary processes are executed.
After sequence comes the means by which the steps or tasks
will be carried out. It is understood that a project is "the application of resources
to a process to produce a result." People usually think of resources as labor, time,
and money, but for understanding the process you must consider other resources such as
tools, techniques, technology, and factors particular to "resources" such as the
skill and experience of the team members. Therefore, the definition of means includes all
aspects you should consider so that you can understand and improve processes. It is
helpful to consider the means separately in categories such as management, technology,
teams (or people), tools, techniques, and environment.
Capability and Capacity
For effective process improvement, an organization must consider all of its processes
collectively. As defined so far, a process is a sequence and a set of means. By this
definition, each organization would have a virtually infinite number of processes
(possible combinations of E, T, and Q). Therefore, the additional dimensions of capability
and capacity must be understood. Each possible combination of E, Q, and T
defines a capability. The current ability of the organization to execute a capability
defines capacity.
This is not as complicated as it may sound. For example, one of
the means defined as "Red Team" is comprised of members with certain experience
and knowledge. Red Team projects are done faster, better, and cheaper than
"Blue" or "Green" Team projects. Red Team performance levels are a
"capability." Because the organization may have only a limited number of
employees qualified to form Red Teams, there is a limited capacity associated with the Red
Team capability.
Innovation and Continuous Improvement
There are two categories of improvement: continuous improvement and innovation.
Continuous improvement of processes is the systematic upgrading of lower capability means
to give higher capacity at a higher capability. To use the prior example, continuous
improvement of team capability would be to provide training to Blue and Green Team members
so that more Red Teams can be formed.
Innovation is the introduction of new capability. Again, using
the prior example, innovation would be training everyone in a new technique. Everyone,
even the Red Team, would have a greater capability to execute the new technique. It is
important to note that innovation usually introduces learning curve dynamics and a risk of
failure to a greater extent than continuous improvement.
Following is another distinction between strategy and process
improvement. Again, using our example, if you were to merely adopt a strategy to replace
Green and Blue Team members with Red Team-qualified candidates, better values of
performance (E, Q, and T) would be expected. However, Red Team-caliber candidates are
expensive and much harder to find. Green and Blue Team members could be trained (their
processes improved); however, process improvement requires understanding the
processyou need to know what will improve a process and how much improvement is
needed. For example, the cost of making your Blue and Green Team members perform like the
Red Teams must first be determined, then the benefit of improving team performance can be
discovered.
As in anything complex, what is "obvious" is not always
true, and what is true is not always obvious. Only by improving your understanding of the
process can you manage the risk of making changes that do not result in the desired
improvement.
Tools for Process Improvement
For all of the above categorization, there are still two categories of process improvement
that need to be considered when you apply the available process improvement tools. There
are repetitive processes, such as most manufacturing, and there are nonrepetitive
processes, such as software engineering.
Repetitive Processes
Virtually all of the common process and statistical process control (SPC) literature
focuses on repetitive process principles and examples. Characteristics of these processes
are a mostly fixed precedence, sequence, and means. Generally, the process flow-chart tool
is used to understand and improve these processes, with care to use the decision element
of the flow-chart tool to divide flow into segments that are distributed in such a manner
that SPC tools can be used to analyze data (see Figure 1).
Figure 1. Flow charting without documenting the properties makes a nice picture but a
poor tool for process understanding and improvement.
Nonrepetitive Processes
The goal in process improvement for software engineering is to improve non-repetitive
processes. Your understanding of these processes comes from analysis of the effects of
variation in the means of production on performance. For nonrepetitive processes, attempts
to understand and improve processes by using repetitive process tools and techniques will
yield the same results as trying to teach a pig to singyou get no singing, and it
upsets the pig.
The key to understanding nonrepetitive processes is knowing that
while the means may be similar from project to project, the steps and sequence can never
be exactly the same. That is, even if you start a new project with the last project's
teams (people and skills), management (people, styles, and leadership), and tools and
techniques in the same environment, you are nevertheless dealing with a different project.
However, there are myriad aspects of the means (management, teams, tools, techniques,
environment, etc.) that can be measured in a way so the variation in these measures can be
related to variations in performance (E, T, and Q) for any project.
However, at this point you do not necessarily yet understand the
nature of your nonrepetitive processes. Notice in the process flow-chart tool description
from Figure 1 that the volume property of the arrows, along with the
"normalization" use of decisions, allows an analyst to "normalize out"
variation due to throughput and size. For nonrepetitive processes, project cost, defects,
and duration will vary due to differences in the means of completing the project and the
(deliberately) heretofore not mentioned size factorchanging the size of a project
can change everything.
I have not mentioned the size measurement because it seems to
work like a light switchflip the switch and about half the people turn on and the
rest turn off. The goal of a size measure is to remove variation due to size from the
analysis without introducing another source of variation and without removing a
process-related source of performance variation. If your size measure does this (some
straightforward statistical analysis will tell), you are on the right track.
An Example
To illustrate how this translates into reality, I use an example with which I assume most
readers are familiar: the Software Engineering Institute (SEI) Capability Maturity Model
(CMM). In a simplistic view, the CMM measures capability maturity on a scale of Level 1 to
Level 5 with Level 5 being most mature. Several practitioners and analysts have also
developed relationships between the CMM maturity level and performance in each dimension
of process measurement (E, T, and Q), notably, the higher the maturity level, the better
the performance. From the analyses I have seen, the differences in each E, T, and Q are
substantial, and I assume they are statistically significant.
The nonrepetitive process improvement model is analogous to this
view of the SEI CMM. That is, for each of the means (management, teams, tools, techniques,
environment, etc.), a scale of possible conditions is developed, and criteria to evaluate
that means according to that scale are prepared. For example, imagine project management
is the means being evaluated. The low end of the scale would be no project management or
maybe a project lead and no formal tracking. The top of the scale would be a full-time
project manager who reports to the project management office and uses a full set of
project management tools.
With all means identified and a scale created for each of the
means, the values of the means for any given project constitute a process. Improvement of
the process is the improvement of the means. Figure 2 shows how a process is managed to
obtain a performance result. For the organization measured, the scale in each means, e.g.,
management, represents the range of influence of the measured capability on performance.
For any project, the actual value of the mean (the triangle symbol) predicts the
contribution of that aspect to the overall performance of the project. The process model
shows the collective effect of the measured means values on project performance and gives
the overall predicted project performance. The goal of performance measurement then
becomes measuring actual performance against predicted performance to detect problems.
Process improvement is working on the means, both for capability (higher levels on the
scale) and for capacity (how much is available for use).
Project Management is (1) identifying
the process used (and predicted performance) and (2) assuring that the actual performance
equals predicted performance.
Process Improvement is (1) improving your capacity at each higher level of
capability (more projects at the higher expectation levels) and (2) increasing your
capability in each of the process areas (dotted lines).
Figure 2. Managing a process to obtain a performance result.
If you know what to do, calibrating the process improvement
model can be straightforward, i.e., for any given set of means, values for E, Q, and T
(exclusive of special causes) can be predicted. It follows that if the model is
calibrated, the effect of changes in the means (benefits) can also be quantified. Finally,
understanding the means makes improvement actions and investments evident and makes
improvement cost (time and money) easily determined. You now have the action, cost, and
benefit of process improvement objectively in front of you. Now more can be done than
said.
It also is important to note that even in a calibrated model, it
is likely that the variation in performance effect for the lower levels of a means is much
greater than for higher levels. That translates into the risk that the prediction at low
levels will be off. In analysis theory, these are prediction anomalies called outliers,
which are ignored. In process improvement, these must be accommodated. There are some
stellar software producers at CMM Level 1; therefore, at Level 1, the model is not fully
predictive. However, the overwhelming odds are that Level 1 performance will be worse than
the performance of organizations at higher levels.
The real key to process improvement is hidden in the first phrase
of a sentence two paragraphs back: "If you know what to do, ..." Process
improvement is not intuitive ("perfect practice makes perfect"). At risk
of confusing my explanation of process improvement, the process that most needs
implementing is the one you use for process improvement. Once this process is good, the
result will be an improved software engineering process. In other words, for process
improvement to succeed, the skill level of the process improvement project team must be
high, not the skill level in software engineering groups.
Most organizations do not have the requisite process improvement
skills among their management or staff. No matter how motivated, facilitated, or well led,
a team without the right skills is likely to fail to implement process improvement. If you
are in a typical organization, process improvement has failed at least once. If you blamed
the team, you were wrongyour expectations were unfounded. If you blamed process
improvement merely because it is an art that is difficult to master, you were wrong,
tooprocess improvement is alive and well and works great in the right hands. If you
brought together the right resources in the right place at the right time with the right
management and right leadership, you probably did not read this far. Good Luck.
About the Author
Steve Neuendorf is an independent
management consultant. He has over 25 years measurement and process improvement
experience, with over 15 years in software engineering process improvement. He has a
bachelor's, a master's, and a doctorate from the University of Puget Sound.